4/7/2024 0 Comments Ies ve material![]() ![]() My only thought is that possibly the adjacent buildings are causing some large, phantom heating load to drive this. Even after drastically upsizing these boxes, the main fan and the heating system the error existing with but a small dent in the unmet hours total. There are two VAV boxes serving zones in the basement/below grade floor.įor these basement zones the model is giving an error regarding the a large number of unmet heating hours in the basement. The HVAC system will be a VAV Reheat with hydronic heat, dual max thermostat. The space types for this below grade area are predominately offices. Additionally, there are conditioned spaced to the front and rear of the below grade story. The structure is existing and has existing, conditioned buildings on both sides and above. The space itself is 1 story below grade and 2 above. All I am using IES to demonstrate a performance based approach to Title 24 an altered retail facility. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |